Find land worth testing
Search whole councils for parcels with the right scale, constraints and viable grid locality before options are signed.
From a UK search area or field boundary to a terrain-aware layout, viable grid connection and decision-ready commercial case. One run, with the evidence left on the record.
CurveSolar resolves the coupled questions together: what fits, where it connects, what it costs and whether the case survives uncertainty.
Search whole councils for parcels with the right scale, constraints and viable grid locality before options are signed.
EA LiDAR, planning constraints and authoritative OSGB geometry become one measured site model.
Terrain-aware rows, equipment zones and cable routes are designed together, preserving usable land where a compact footprint wins.
Nearby POCs are ranked by effective headroom, voltage, route length and the full project economics at each viable size.
A STOP, HOLD or PROCEED case is issued with the engineering evidence, assumptions and human approval trail attached.
Every recommendation is tied back to geometry, source data and a stated assumption. The attractive answer is never allowed to hide the hard one.
Measured slopes, local pitch, shading and grading pressure from EA LiDAR rather than a flat-site assumption.
Compact build zones, inverter placement, collection routing and export corridors optimized as one electrical system.
Physical proximity is separated from viable capacity, then project size is tested against each credible connection.
Suitability weights are perturbed hundreds of times so unstable recommendations are exposed before land is pursued.
Road, rail, water and street-works evidence informs the cable route, crossing strategy and connection cost.
Yield, CAPEX, rent, connection and NPV combine with non-negotiable planning and grid gates.
The report says what is attractive, what can still be used, what has to change and exactly why the present basis is a STOP, HOLD or PROCEED.
Open CurveSolar